Permitting and Regulatory Approval for Cellular DAS, Wi-Fi, and ERRCS
Turnkey permit management for in-building wireless systems including code review, drawings, AHJ coordination, inspections, and final sign off.
Trusted Permitting Partner for Cellular DAS, ERRCS, and Wi-Fi Deployments
At CellAntenna, we specialize in wireless system engineering and in-building wireless design. Whether you’re deploying cellular DAS (Distributed Antenna Systems), ERRCS / Public Safety DAS, or Wi-Fi networks, our team delivers precise, code-compliant designs that meet your coverage goals and budget. We have a proven record of success in dealing with local AHJs and fire marshals across the United States. Our permitting services include full package preparation with code compliance narratives, engineered drawings, and calculations, as well as standards aligned with FCC rules for public safety radio systems. We provide rapid revisions and resubmittals to keep project timelines on track, along with coordination between design and installation to help prevent permit comments before they occur.
These services result in faster approvals through complete and correct first submittals, lowering total project cost by avoiding redesigns and jobsite delays. Our approach ensures compliance with fire and building code requirements, helping to create smoother inspections and functional testing for final acceptance. The process is scalable and supports both single sites and nationwide portfolios.
Code and Scope Review
We evaluate project scope, verify frequencies, survivability, and coverage intent, then outline the permit path for DAS, Wi-Fi, and ERRCS.
AHJ Coordination and Submittals
We engage the authority having jurisdiction early, confirm local submittal checklists, and deliver application forms, narratives, and required attachments.
Engineered Drawings and Calculations
Stamped drawing sets include floor plans, antenna layouts, cable routing, risers, power and battery sizing, signal levels, and survivability details.
Corrections and Variances Management
When comments arrive we prepare responses, design adjustments, and if needed variance requests, then resubmit until approval is issued.
Inspections, Testing, and Closeout
We schedule and support inspections, run acceptance tests including grid testing for closeout.
Multi-State and Expedited Permitting
Our team handles low voltage and public safety permits across diverse jurisdictions and leverages complete packages to qualify for expedited review where available.
Seamless Connectivity Starts with CellAntenna Wireless
From public safety to next generation connectivity, our team tests, designs, installs, and maintains advanced systems nationwide.
Why Partner With CellAntenna
Trusted Nationwide Since 2002
Let's Discuss Your Project
Schedule a Free Consultation
Our solutions close coverage gaps, enhance communication, and support critical connectivity nationwide.